| |
|
|
|
INFRAESTRUCTURAS |
|
| |
|
ACTUAL DEVELOPMENT |
TOTAL DEVELOPMENT |
BERTHING LINE |
1.780 m. |
2.280 m. |
DEPTH |
16 m. |
= |
TOTAL AREA |
113 ha. |
158 ha. |
GATES (in and out) |
16 |
= |
REEFER CONNECTIONS |
804 conex. RF |
|
|
| |
|
|
|
|
|
| |
Rail area |
50.000 m2 |
50.000 m2 |
Tracks |
4 + 1 x 650 m. |
9 + 1 x 650 m. |
Annual handling capacity |
150.000 TEU |
300.000 TEU. |
Simultaneous operations |
20 trains |
40 trains |
|
|
| |
|
|
|
|
|
| |
7 Over Super Post Panamax (21&23 conts. manga, 61 tons bajo spreader) |
4 Super Post Panamax (18/19 conts. manga, 40 tons bajo spreader) |
4 Post Panamax (16 conts. manga, 40 tons bajo spreader) |
1 Panamax (13 conts. manga, 32,5 tons bajo spreader) |
|
|
| |
|
|
|
Ground Operations |
|
| |
64 RTG |
4 Reach Stacker |
19 Front Handler |
91 Yard tractors |
107 Yard chassis |
|
|
| |
|
|
|
Localization |
|
|
Longitud (Greenwich) |
0º 18’ 1” W |
Latitud |
39º 26’ 9” N |
Atraque: |
Según instrucciones |
Mareas: |
No significativas |
|
|
| |